The best time to plan a spring roof or siding replacement in the Twin Cities is December through February. Winter booking locks in an early spot on the spring schedule, leaves time to settle any insurance claim, and lets you choose materials and colors without pressure. Homeowners who wait until April are usually behind the first storm rush.
Why winter is the right planning window
Exterior crews can't do much when the north metro sits in the 20s°F with snow on the roof, so winter is when contractors have time to inspect, measure, and plan carefully. It's also before the May-through-August hail season fills every calendar in the metro. Planning now means you're first in line when the ground thaws.
Get the inspection and estimate done now
A winter inspection of the roof, attic, and siding gives you a clear scope and a firm written estimate. Nothing about the assessment needs warm weather. See roofing services.
Settle insurance claims before the busy season
If a past storm caused damage, use the slow months to file, meet the adjuster, and get the scope approved. Come spring, adjusters and contractors are both swamped, and claims move slower. See insurance claims assistance.
Take your time on materials and colors
Winter is when you can actually compare shingle lines, siding profiles, and color samples against your house, get samples home, and decide without a crew waiting. See siding services.
Lock your place on the spring calendar
A signed contract and deposit in January reserves an early-season install date. Those first dry-weather slots in April and May go to homeowners who planned ahead.
What can and can't be done before the thaw
Inspections, estimates, contracts, permits, material orders, and color selection: all fine in winter. Tear-off and install for a full roof or re-side generally wait for consistent above-freezing temperatures and a dry roof — though emergency repairs happen year-round.
A simple winter planning timeline
- December: book the inspection, review findings
- January: finalize scope, file or advance any insurance claim, choose materials
- February: sign the contract, place the deposit, reserve an install window
- March–April: materials staged, install scheduled for the first good weather
Frequently asked questions
Will prices go up by spring? Material costs tend to rise heading into the season; locking a quote now protects the price.
Can work start in March? Weather-dependent. Early slots fill first, so booking now gets you one.
Do I pay now? A deposit holds your date; the balance follows the normal progress schedule.
What if a storm hits before spring? You're already in the queue and ahead of the rush.
Start planning your spring project
Total Home Exteriors has scheduled north metro spring projects every winter since 2003. Call 612-388-7795 or contact us.
Have Questions?
Our team is happy to answer questions about any service — no sales pressure.
Take Action Today
Serving the Twin Cities for 20+ Years
Licensed, insured, and ready to help with your next exterior project.